Installation
InspectionInstallation
MECHANICAL(H4DO) > Timing Chain AssemblyINSTALLATION1. TIMING CHAIN LHNOTE:• Be careful that the foreign matter is not into or onto the assembled component during installation.• Apply engine oil to all component parts of the timing chain.1. Prepare to attach the chain tensioner LH.(1) ...
Installation
EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > Leak Check Valve AssemblyINSTALLATION1. Install the leak check valve assembly to the vehicle with the bolt and clip (A).Tightening torque:7.5 N·m (0.8 kgf-m, 5.5 ft-lb)2. Connect the connector to the leak check valve assembly.3. Conn ...
Installation
FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Intake ManifoldINSTALLATION1. Install the engine wiring harness. Engine Wiring Harness > INSTALLATION">2. Install the intake manifold to the tumble generator valve assembly.NOTE:Use a new gasket.Tightening torque:8.3 N·m (0.8 kgf-m, 6.1 ft- ...