FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Tumble Generator Valve Assembly
INSTALLATION
Install in the reverse order of removal.
NOTE:
Use a new gasket.
Tightening torque:
25 N·m (2.5 kgf-m, 18.4 ft-lb)
Removal
Fuel ProcedureInstallation
MECHANICAL(H4DO) > Cam SprocketINSTALLATION1. CAM SPROCKET RH• Intake cam sprocket RH1. Install the intake cam sprocket RH by aligning the knock hole (A) of intake cam sprocket RH and the knock pin (B) of intake camshaft RH.NOTE:Before installation, check that there is no foreign matter on ...
Inspection
AUTO HEADLIGHT BEAM LEVELER SYSTEM (DIAGNOSTICS) > General DescriptionINSPECTION1. BASIC INSPECTIONBefore performing the diagnosis, check the following items which may cause problems relating the wiper or light.1. Check the battery. Battery">2. Check the relay and fuse condition. Relay ...
Assembly
CLUTCH SYSTEM > Master CylinderASSEMBLY1. Apply a coat of grease to the contact surfaces of the push rod and piston before installation.Grease:SILICONE GREASE G-40M or equivalent2. Assemble in the reverse order of disassembly.Tightening torque:10 N·m (1.0 kgf-m, 7.4 ft-lb) ...