LIGHTING SYSTEM > Day Time Running Resistor
INSPECTION
1. Measure the resistance between connector terminals.
Preparation tool:
Circuit tester
Terminal No. | Inspection conditions | Specification | Connection diagram |
1 — 2 | Always | 1.13±0.05 ? |

2. Replace the resistor assembly - daytime running light if the inspection result is not within the standard.
RemovalInstallation
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > Automatic Transmission AssemblyINSTALLATION1. Attach the ST to converter case.ST 498277200STOPPER SET2. When completely overhauling the transmission, refill CVTF through the transmission right side plug. Preparation for Overhaul">3. Replace ...
Installation
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > Primary Speed SensorINSTALLATIONCAUTION:Be sure to prevent water or oil from contacting the connector terminal of primary speed sensor. If adhesion occurs, replace with a new part.Install in the reverse order of removal.NOTE:• Use new O-rings.&bul ...
Remote engine start system Wiring diagram
WIRING SYSTEM > Remote Engine Start SystemWIRING DIAGRAM ...