Installation
InspectionInstallation
EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > CanisterINSTALLATION1. Install the canister to the vehicle using bolts and nuts.Tightening torque:7.5 N·m (0.8 kgf-m, 5.5 ft-lb)2. Install the drain tube (A), vent tube (B) and purge tube (C) to the canister.CAUTION:• Check tha ...
Caution
EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > General DescriptionCAUTION• Prior to starting work, pay special attention to the following:1. Always wear work clothes, a work cap, and protective shoes. Additionally, wear a helmet, protective goggles, etc. if necessary.2. Protect th ...
Intake and exhaust valve Specification
MECHANICAL(H4DO) > Intake and Exhaust ValveSPECIFICATIONRefer to “Cylinder Head” for removal and installation procedures of the intake and exhaust valves. Cylinder Head > REMOVAL"> Cylinder Head > INSTALLATION"> ...