LIGHTING SYSTEM > Door Switch
REMOVAL
1. Disconnect the ground cable from battery. NOTE">
2. Remove the switch assembly - door.
(1) Remove the screws, and pull out the switch assembly - door toward you.
(2) Disconnect the connector and remove the switch assembly - door.

Inspection
InstallationCurrent date and time setting
1. Perform the preparation steps according
to "Preparation for date setting" 3-
56.
2. Operate the "
" or "
" switch to
select the "Time/Date" item. Then push
the
button.
3. Select the item to set by operating the
"
" or "
" switch. Then push the
button.
...
Dtc b1838 short in curtain shield airbag lh squib circuit (to +b)
AIRBAG SYSTEM (DIAGNOSTICS) > Diagnostic Chart with Trouble CodeDTC B1838 SHORT IN CURTAIN SHIELD AIRBAG LH SQUIB CIRCUIT (TO +B)Diagnosis start condition:Ignition voltage is 10 V to 16 V.DTC detecting condition:• Curtain airbag harness (LH) is shorted to power supply.• Curtain airbag ...
Installation
HVAC SYSTEM (HEATER, VENTILATOR AND A/C) > Control PanelINSTALLATIONCAUTION:• Before handling the airbag system components, refer to “CAUTION” of “General Description” in “AIRBAG SYSTEM”. General Description > CAUTION">• After installing ...