Replacement
InspectionInspection
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > Turbine Speed SensorINSPECTION1. Set the ST between the TCM and bulkhead harness.ST 18460AA040CHECK BOARD2. Set the probe of oscilloscope to the check board connector.Connector & terminalNo. 12 (+) — No. 42 (−):(A)+ probe(B)− probe3 ...
Installation
POWER ASSISTED SYSTEM (POWER STEERING) > Electric Power Steering GearboxINSTALLATION1. Insert the steering gearbox assembly into crossmember, being careful not to damage the boot of the steering gearbox assembly.2. Install the steering gearbox assembly to the crossmember by tightening the bolts t ...
Clear setting
1. Perform the preparation steps according
to "Preparation for maintenance settings"
2. Operate the " " or "
" switch to
select the "Clear All Settings" item. Then
push the button.
3. The system will prompt a Yes/No
dialogue ("No" is selected first). To clear
all maintenance settin ...