Subaru Crosstrek manuals

Subaru Crosstrek Service Manual: Preparation for overhaul Procedure

Subaru Crosstrek Service Manual / Mechanical(h4do) / Preparation for overhaul Procedure

MECHANICAL(H4DO) > Preparation for Overhaul

PROCEDURE

1. After removing the engine from the vehicle body, attach the ST to the engine as shown in the figure.

NOTE:

When using a commercially sold engine stand, follow the instructions of engine stand used.

Tightening torque:

35 N·m (3.6 kgf-m, 25.8 ft-lb)

ST1 498457000ENGINE STAND ADAPTER RH
ST2 498457100ENGINE STAND ADAPTER LH
ST3 18362AA020ADAPTER
ST4 499817100ENGINE STAND

2. In this section the procedures described under each index are all connected and stated in order. The procedure for overhauling of the engine will be completed when you go through all steps in the process.

Therefore, in this section, to conduct the particular procedure within the flow of a section, you need to go back and conduct the procedure described previously in order to do that particular procedure.

Piston Specification
MECHANICAL(H4DO) > PistonSPECIFICATIONRefer to “Cylinder Block” for removal and installation procedures of pistons. Cylinder Block > REMOVAL"> Cylinder Block > INSTALLAT ...

Occupant detection system (diagnostics)
...

Other materials:

Dtc b2809 vdc malfunction
EyeSight (DIAGNOSTICS) > Diagnostic Procedure with Diagnostic Trouble Code (DTC)DTC B2809 VDC MALFUNCTIONDetected when error occurs in the VDC. (VDC failure)When lost communication with vehicle dynamics control and vehicle dynamics control module abnormal or VDC echo back disagreement occur simul ...

Inspection
LIGHTING SYSTEM > Hazard SwitchINSPECTION1. Measure the resistance between connector terminals.Preparation tool:Circuit testerTerminal No.Inspection conditionsStandard2 — 3Switch OFF1 M? or moreSwitch ONLess than 1 ?2. Apply battery voltage between the connector terminals to check the lighting ...

Inspection
FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Tumble Generator Valve AssemblyINSPECTION1. CHECK MOTOR1. Connect the battery positive terminal to terminal No. 5 and the battery ground terminal to terminal No. 4, and check that the valve is fully opened on LH side and the valve is fully closed on RH side.C ...

© 2016-2026 Copyright www.sucross.com