EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > General Description
COMPONENT
1. CANISTER, LEAK CHECK VALVE ASSEMBLY AND DRAIN SEPARATOR
For structures of the canister, leak check valve assembly and drain separator, refer to “FU (H4DO)”. General Description > COMPONENT">
2. EGR SYSTEM 1

(1) | EGR control valve | (7) | O-ring | Tightening torque: N·m (kgf-m, ft-lb) | |
(2) | O-ring | (8) | Clip | T1: | 6.4 (0.7, 4.7) |
(3) | Gasket | (9) | Preheater hose A | T2: | 18 (1.8, 13.3) |
(4) | Engine coolant temperature sensor | (10) | Clip | T3: | 22 (2.2, 16.2) |
(5) | Gasket | (11) | Preheater hose B | ||
(6) | Water pipe ASSY (MT model) | (12) | Water pipe ASSY (CVT model) | ||
3. EGR SYSTEM 2

(1) | Gasket | (6) | Gasket | Tightening torque: N·m (kgf-m, ft-lb) | |
(2) | Gasket | (7) | Gasket | T1: | EGR Pipe > INSTALLATION"> |
(3) | EGR pipe | (8) | Clip | T2: | EGR Cooler > INSTALLATION"> |
(4) | EGR cooler (CVT model) | (9) | Engine coolant hose | ||
(5) | EGR cooler (MT model) | ||||
4. PCV SYSTEM 1

(1) | PCV connector | (3) | O-ring | Tightening torque: N·m (kgf-m, ft-lb) | |
(2) | O-ring | T: | 6.4 (0.7, 4.7) | ||
5. PCV SYSTEM 2

(1) | PCV hose A | (3) | PCV hose B | Tightening torque: N·m (kgf-m, ft-lb) | |
(2) | PCV valve | (4) | Clip | T: | 23 (2.3, 17.0) |
Preparation toolInstallation
INSTRUMENTATION/DRIVER INFO > Multi-function Display (MFD)INSTALLATIONCAUTION:• Make sure the electrical connector is connected securely.• Make sure that the multi-function display (MFD) operates normally.• After installing the center grille assembly, check that the air vent gri ...
Preparation
1. Turn off the ignition switch.
2. Close all doors (including rear gate).
3. Press and hold the " "
button on the
access key. All doors (including rear gate)
will then be locked.
4. Keep the " " button
pressed, and
press the rear lock button within 5
seconds after step ...
Installation
COOLING(H4DO) > Water Pipe AssemblyINSTALLATION1. WATER PIPE ASSEMBLY RH1. Set the water pipe assembly RH on the engine, and connect the water pipe hose RH (B) to the oil pan upper.2. Secure the water pipe assembly RH to the cylinder head RH with bolt (A).Tightening torque:6.4 N·m (0.7 kgf ...