EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > PCV Valve
INSTALLATION
Install in the reverse order of removal.
NOTE:
Apply liquid gasket to the bolt threads of PCV valve.
Liquid gasket:
THREE BOND 1324 (Part No. 004403042) or equivalent
Tightening torque:
23 N·m (2.3 kgf-m, 17.0 ft-lb)
RemovalComponent
REAR SUSPENSION > General DescriptionCOMPONENT1. REAR SUSPENSION(1)Rear sub frame ASSY(11)Stopper LWRTightening torque: N·m (kgf-m, ft-lb)(2)Stopper UPR(12)Flange nutT1:30 (3.06, 22.1)(3)Stay - rear frame COMPL(13)Rear stabilizerT2:33 (3.36, 24.3)(4)Front sub frame support(14)Bushing - sta ...
Snow tires
WARNING
When replacing or installing winter
tire(s), all four tires must be
the same for following items.
(a) Size
(b) Circumference
(c) Speed symbol
(d) Load index
(e) Construction
(f) Manufacturer
(g) Brand (tread pattern)
(h) Degrees of wear
For the items (a) to (d), you must
obey th ...
Wiring diagram
CONTROL SYSTEMS > AT Shift Lock Control SystemWIRING DIAGRAM1. MODEL WITHOUT PUSH BUTTON IGNITION SWITCH(1)Ignition switch(5)TCM (shift range information)(9)Battery(2)Stop light and brake switch(6)Key lock solenoid(10)ECM (delivery (test) mode signal)(3)Key warning switch(7)Shift lock solenoid(11 ...