EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > EGR Pipe
INSTALLATION
1. Temporarily install the EGR pipe to the intake manifold and water pipe assembly, and tighten the EGR pipe in numerical order as shown in the figure.
NOTE:
Use a new gasket.
Tightening torque:
6.4 N·m (0.7 kgf-m, 4.7 ft-lb)

2. Install the throttle body to the intake manifold.
Tightening torque:
8.0 N·m (0.8 kgf-m, 5.9 ft-lb)

3. Connect the connector to the throttle body.

4. Install the air intake boot. Air Intake Boot > INSTALLATION">
5. Connect the battery ground terminal.

RemovalKeyless access system check Operation
KEYLESS ACCESS WITH PUSH BUTTON START SYSTEM (DIAGNOSTICS) > Keyless Access System CheckOPERATION1. On «Start» display, select «Diagnosis».2. On «Vehicle selection» display, input the target vehicle information and select «Confirmed».3. On «Main Menu» display, select «Each System».4. ...
Trailer brakes
WARNING
Adequate size trailer brakes are
required when the trailer and its
cargo exceed 1,000 lbs (453 kg)
total weight.
Do not directly connect your
trailer's hydraulic brake system
to the hydraulic brake system in
your vehicle. Direct connection
would cause the vehicle's brake
...
Installation
MANUAL TRANSMISSION AND DIFFERENTIAL(5MT) > Transmission CaseINSTALLATION1. Wipe off grease, oil and dust on the mating surfaces of transmission cases with cleaning solvent.2. Install the reverse idler gear. Reverse Idler Gear > INSTALLATION">3. Install the shifter fork and rod. Shif ...