Installation
InspectionInspection
CONTROL SYSTEMS > AT Shift Lock Solenoid and “P” Range SwitchINSPECTIONSTEPCHECKYESNO1.CHECK SOLENOID UNIT.Measure the resistance of solenoid unit connector terminals.TerminalsNo. 4 — No. 3:Is the resistance 27.6 — 30.5 ?? AT Shift Lock Solenoid and “P” Range Switch &g ...
Inspection
EyeSight > Relay and FuseINSPECTION1. CHECK FUSE1. Remove the fuse and inspect visually.2. If the fuse is blown out, replace the fuse.NOTE:If the fuse is blown again, check the system wiring harness.2. CHECK RELAY1. Measure the resistance between relay terminals.Terminal No.Inspection conditionsS ...
Location
ENTERTAINMENT > Relay and FuseLOCATIONRelay & fuse boxFuse 20 A (rear accessory power supply socket)(A)Fuse 10 A (front accessory power supply socket)(B)Fuse 10 A (audio, navigation unit, AUX input terminal, data communication module*1)(C)Fuse 15 A (data communication module*1)(D)*1: Model wi ...