Removal
InstallationInspection
FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Tumble Generator Valve AssemblyINSPECTION1. CHECK MOTOR1. Connect the battery positive terminal to terminal No. 5 and the battery ground terminal to terminal No. 4, and check that the valve is fully opened on LH side and the valve is fully closed on RH side.C ...
Installation
DIFFERENTIALS > Rear Differential (T-type)INSTALLATION1. Attach the rear differential member plate to the rear differential.(A)Rear differential member plate2. Set the rear differential to transmission jack.3. Set the ST to the rear differential.ST 28099PA090OIL SEAL PROTECTOR4. Insert the rea ...
Control module i/o signal Electrical specification
BODY CONTROL SYSTEM (DIAGNOSTICS) > Control Module I/O SignalELECTRICAL SPECIFICATIONDescriptionTerminal No.Signal (V or ?)NoteIgnition switch ON(Engine OFF)Ignition power supply (rear wiper)A5 ←> Chassis groundLess than 1.5 V > 10 — 13 VIgnition switch OFF > ONBattery power suppl ...