EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > EGR Control Valve
INSTALLATION
Install in the reverse order of removal.
NOTE:
Use new O-rings and gaskets.
Tightening torque:
22 N·m (2.2 kgf-m, 16.2 ft-lb)

Tightening torque:
3 N·m (0.3 kgf-m, 2.2 ft-lb)

Removal
Egr coolerInspection locations after a collision Inspection
AIRBAG SYSTEM > Inspection Locations after a CollisionINSPECTIONIf the vehicle is involved in a collision, even if it is a slight collision, be sure to check the following systems.1. DRIVER’S AIRBAG MODULE ASSEMBLY1. Frontal collision (driver’s airbag module assembly activated)(1) Rep ...
Using aha application
1. When the top screen is displayed,
touch the station key.
Example of the main screen
2. Select the desired station from the list.
The selected station is displayed.
NOTE
The following operations are not
available on this system. Perform these
operations on the smartphone.
Add ...
Disassembly
STARTING/CHARGING SYSTEMS(H4DO) > StarterDISASSEMBLYCAUTION:The starter should be placed through a no-load test whenever it has been overhauled.1. Disconnect the cable from the magnet switch assembly.2. Remove the magnet switch assembly from the starter housing assembly.3. Remove screws (A) of th ...