HVAC SYSTEM (HEATER, VENTILATOR AND A/C) > Blower Resistor (Manual A/C Model)
INSPECTION
1. Check the resistance between resistor terminals.
Preparation tool:
Circuit tester
Terminal No. | Standard | Connection diagram |
4 — 3 | Approx. 0.43 ? |

4 — 2
Approx. 1.03 ?
4 — 1
Approx. 3 ?
2. Replace the resistor if the inspection result is not within the standard.
RemovalInstallation
FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Fuel Delivery and Evaporation LinesINSTALLATIONInstall in the reverse order of removal while being careful of the following.NOTE:When connecting the fuel delivery tube (a) and evaporation hose (b), let the bushing (c) contact the quick connector (d) of fuel d ...
Installation
CLUTCH SYSTEM > FlywheelINSTALLATION1. Press in a new pilot bearing to the position where it is flush with the flywheel surface or up to 0.4 mm (0.016 in) deeper than that.CAUTION:Do not press the bearing inner ring.(A)Pilot bearing2. Temporarily tighten the crankshaft position sensor plate and f ...
Assembly
POWER ASSISTED SYSTEM (POWER STEERING) > Electric Power Steering GearboxASSEMBLY1. Install the tie-rod into rack.Tightening torque:90 N·m (9.18 kgf-m, 66.4 ft-lb)NOTE:Check the mating face of rack and tie-rod for foreign matter such as dust etc.2. Apply a coat of grease to the tie-rod groo ...