Installation
AdjustmentSchedule Maintenance schedule
PERIODIC MAINTENANCE SERVICES > ScheduleMAINTENANCE SCHEDULE1. MODEL WITH US SPECIFICATIONMaintenance itemMaintenance interval[Number of months or km (miles), whichever occurs first] Months3612182430364248546066To be continued to the next table.Remarks? 1,000 km4.89.619.228.838.44857.667.276.886. ...
Adjustment
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > Drive Pinion Shaft AssemblyADJUSTMENT1. Remove the liquid gasket from the mating surface completely.2. Using the ST, install the drive pinion retainer to converter case.ST 18270KA020SOCKET (E20)NOTE:Do not confuse the three different-length bolts whe ...
Inspection
FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Main RelayINSPECTION1. Check that the main relay has no deformation, cracks or other damages.2. Measure the resistance between main relay terminals.Terminal No.Standard1 and 21 M? or more3 and 4130.4 — 230.8 ? (when 20°C (68°F))3. Conn ...