Operation
InspectionInstallation
POWER ASSISTED SYSTEM (POWER STEERING) > Universal JointINSTALLATION1. Before installation, check the universal joint assembly - steering. Universal Joint > INSPECTION">2. Adjust the tilt position of the column assembly - steering to the neutral position and lock the tilt lever.3. Ali ...
Initial illumination for system check
Several of the warning and indicator lights
illuminate when the ignition switch is
initially turned to the "ON" position. This
permits checking the operation of the
bulbs.
Apply the parking brake and turn the
ignition switch to the "ON" position. For
the system check, the following lights
...
Installation
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > Torque Converter AssemblyINSTALLATION1. Install the O-ring to the input shaft.NOTE:• Use new O-rings.• Apply CVTF to the O-ring.2. While holding the torque converter assembly by hand, carefully install it into the torque converter case.NOTE: ...