Operation
InspectionPreparation tool
AIRBAG SYSTEM (DIAGNOSTICS) > General DescriptionPREPARATION TOOLCAUTION:To measure the voltage and resistance of airbag system component, be sure to use the specified test harness.1. SPECIAL TOOL• SUBARU SELECT MONITORILLUSTRATIONTOOL NUMBERDESCRIPTIONREMARKS — SUBARU SELECT MONITOR 4Use ...
Inspection
SECURITY AND LOCKS > Push Button Ignition SwitchINSPECTION1. Check the continuity between push button ignition switch terminals.Preparation tool:Circuit testerTerminal No.Inspection conditionsSpecification4 (COM) — 5 (GND)AlwaysContinuity exists7 (SSW1) — 5 (GND)Push button ignition switch re ...
Removal
HVAC SYSTEM (HEATER, VENTILATOR AND A/C) > Blower MotorREMOVAL1. Disconnect the ground cable from battery. NOTE">2. Release the clips, and remove the under cover assembly - passenger.3. Remove the blower - motor.(1) Disconnect the connector.(2) Remove the screws and detach the blower - m ...