Installation
AssemblyInspection
FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Oil Control SolenoidINSPECTION1. Check that the oil control solenoid has no deformation, cracks or other damages.2. Measure the resistance between the oil control solenoid terminals.Terminal No.Standard1 and 27.25±0.4 ? (when 20°C (68°F ...
Installation
SUNROOF/T-TOP/CONVERTIBLE TOP (SUNROOF) > Sunroof MotorINSTALLATIONCAUTION:• For installation of the stereo camera cover assembly, refer to “INSTALLATION”, “Stereo Camera” in the “EyeSight” section and observe the precautions for installation. Stereo Cam ...
Adjustment
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > Primary Pulley and Secondary PulleyADJUSTMENT1. PROCEDURE IN REPLACEMENT OF PRIMARY AND SECONDARY PULLEY, OR IN REPLACEMENT OF PRIMARY PULLEY, SECONDARY PULLEY AND VARIATOR CHAIN1. Measure depth “Lp” from the ST upper face to the primary pul ...