Installation
InspectionSpecification
HVAC SYSTEM (HEATER, VENTILATOR AND A/C) > General DescriptionSPECIFICATION1. HEATER SYSTEMItemSpecificationsConditionHeating capacity5.0 kW (4,299 kcal/h, 17,059 BTU/h) or more• Air flow control dial or switch: FOOT• Temperature control dial: HI (MAX HOT)• Temperature differenc ...
Preparation tool
IMMOBILIZER (DIAGNOSTICS) > General DescriptionPREPARATION TOOL1. SPECIAL TOOLILLUSTRATIONTOOL NUMBERDESCRIPTIONREMARKS — SUBARU SELECT MONITOR 4Used for setting of each function and troubleshooting for electrical system.NOTE:For detailed operation procedures of Subaru Select Monitor 4, refer t ...
Inspection
LIGHTING SYSTEM > Day Time Running ResistorINSPECTION1. Measure the resistance between connector terminals.Preparation tool:Circuit testerTerminal No.Inspection conditionsSpecificationConnection diagram1 — 2Always1.13±0.05 ?2. Replace the resistor assembly - daytime running light if the inspec ...