Installation
InspectionInspection
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > Turbine Speed SensorINSPECTION1. Set the ST between the TCM and bulkhead harness.ST 18460AA040CHECK BOARD2. Set the probe of oscilloscope to the check board connector.Connector & terminalNo. 12 (+) — No. 42 (−):(A)+ probe(B)− probe3 ...
Installation
EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > EGR CoolerINSTALLATION1. Set the gasket to the stud bolt.NOTE:Use a new gasket.2. Temporarily tighten the bolts securing the EGR cooler to the EGR control valve and the cylinder head RH, and tighten in numerical order.NOTE:Use a new gasket. ...
Installation
SECURITY AND LOCKS > Front Hood Lock AssemblyINSTALLATION1. Before installation, check the following items.• Is the cable deformed?• Grease is applied sufficiently to cable joints.If grease is insufficient, add it as necessary before assembling the cable.2. Install each part in the re ...