EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > Front Catalytic Converter
INSTALLATION
The front catalytic converter is integrated into the front exhaust pipe; therefore, refer to “Front Exhaust Pipe” for the installation procedure. Front Exhaust Pipe > INSTALLATION">
RemovalPreparation tool
LIGHTING SYSTEM > General DescriptionPREPARATION TOOL1. SPECIAL TOOLILLUSTRATIONTOOL NUMBERDESCRIPTIONREMARKS — SUBARU SELECT MONITOR 4Used for setting of each function and troubleshooting for electrical system.NOTE:For detailed operation procedures of Subaru Select Monitor 4, refer to “A ...
Installation
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > Torque Converter AssemblyINSTALLATION1. Install the O-ring to the input shaft.NOTE:• Use new O-rings.• Apply CVTF to the O-ring.2. While holding the torque converter assembly by hand, carefully install it into the torque converter case.NOTE: ...
Installation
EXTERIOR BODY PANELS > Rear GateINSTALLATION1. REAR GATE PANELCAUTION:The panel - rear gate is heavy. When removing and installing it, always work in a team of two or more persons.1. Install the hinge - rear gate to the vehicle body.2. Temporarily install the panel - rear gate to the hinge - rear ...