COOLING(H4DO) > Radiator Main Fan and Fan Motor
INSTALLATION
Install in the reverse order of removal.
CAUTION:
Confirm that the radiator hose is securely connected.
NOTE:
If the installation of the radiator main fan and fan motor is difficult, attempt installation after loosening the bolts which hold the radiator sub fan shroud to the radiator.
Tightening torque:
7.5 N·m (0.8 kgf-m, 5.5 ft-lb)
InspectionEngine
SPECIFICATIONS > CrosstrekENGINEModel2.0 L DOHC non-turboEngine typeHorizontally opposed, liquid cooled, 4-cylinder, 4-stroke gasoline engineValve arrangementDOHCBore ? strokemm (in)84.0 ? 90.0 (3.31 ? 3.54)Displacementcm3 (cu in)1,995 (121.7)Compression ratio10.5Ignition order1 — 3 — 2 — 4 ...
Inspection
LIGHTING SYSTEM > Room LightINSPECTION1. ROOM LIGHT BULB1. Visually check the bulb for blow out.2. Check the bulb specification. General Description > SPECIFICATION">3. Replace the bulb if it is found defective.2. ROOM LIGHT SWITCH1. Check the resistance between switch terminals.Prepa ...
Inspection
LIGHTING SYSTEM > Headlight BulbINSPECTION1. HALOGEN TYPECAUTION:• Do not perform work with wet hands, because there is a possibility of electrical shock.• Do not leave the light assembly - head without the bulb and cover - headlight for a long time. Dust, moisture, etc. entering the ...