LIGHTING SYSTEM > SRF OFF Switch
INSPECTION
1. Measure the resistance between connector terminals.
Preparation tool:
Circuit tester
Terminal No. | Inspection conditions | Standard |
2 — 3 | OFF | 1 M? or more |
ON | Less than 1 ? |
2. Apply battery voltage between the connector terminals to check lighting condition of illumination inside the switch.
Terminal No. | Inspection conditions | Specification |
1 (+) — 4 (−) | Apply battery voltage. | Light ON |
3. Replace the SRF OFF switch if the inspection result is not within the standard value.
Inspection
ENTERTAINMENT > Rearview Camera SystemINSPECTION1. Park the vehicle at the level place where there are enough area at the rear of the vehicle.2. Attach the tape as the target point for standard at the floor rearward of the vehicle as shown in the figure below.NOTE:Standard tape width is about 30 ...
Installation
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > Parking PawlINSTALLATION1. Set the range select lever to the “N” range.2. Install the parking pawl shaft, return spring and parking pawl.NOTE:Make sure that the end of return spring sticks out of parking pawl as shown in (a). Make sure that ...
Removal
FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Intake ManifoldREMOVAL1. Release the fuel pressure. Fuel > PROCEDURE">2. Disconnect the ground cable from battery.3. Open the fuel filler lid and remove the fuel filler cap.NOTE:This operation is required to release the inner pressure of the fuel ...