LIGHTING SYSTEM > Relay and Fuse
INSPECTION
1. CHECK FUSE
1. Remove the fuse and inspect visually.
2. If the fuse is blown out, replace the fuse.
NOTE:
If the fuse is blown again, check the system wiring harness.
2. CHECK RELAY
1. Check the resistance between relay terminals.
Terminal No. | Inspection conditions | Standard | Circuit |
1 — 2 | Always | 1 M? or more |
1 — 2
Apply battery voltage between terminals 4 and 3.
Less than 1 ?
Terminal No. | Inspection conditions | Standard | Circuit |
1 — 2 | Always | 1 M? or more |
1 — 4
Always
Less than 1 ?
1 — 2
Apply battery voltage between terminals 3 and 5.
Less than 1 ?
2. Replace the relay if the inspection result is not within the standard value.
Removal
MANUAL TRANSMISSION AND DIFFERENTIAL(5MT) > Reverse Check SleeveREMOVAL1. Remove the manual transmission assembly from the vehicle. Manual Transmission Assembly > REMOVAL">2. Remove the transfer case together with the extension case assembly. Transfer Case and Extension Case Assembly ...
Removal
SECURITY AND LOCKS > Keyless Access CMREMOVALCAUTION:Before handling the airbag system components, refer to “CAUTION” of “General Description” in “AIRBAG SYSTEM”. General Description > CAUTION">1. Disconnect the ground cable from battery and wait fo ...
Preparation tool
OCCUPANT DETECTION SYSTEM (DIAGNOSTICS) > General DescriptionPREPARATION TOOLCAUTION:To measure the voltage and resistance of airbag system and occupant detection system components, be sure to use the specified test harness.1. SPECIAL TOOLILLUSTRATIONTOOL NUMBERDESCRIPTIONREMARKS — SUBARU SELEC ...