FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Main Relay
INSPECTION
1. Check that the main relay has no deformation, cracks or other damages.
2. Measure the resistance between main relay terminals.
Terminal No. | Standard |
1 and 2 | 1 M? or more |
3 and 4 | 130.4 — 230.8 ? (when 20°C (68°F)) |
3. Connect battery positive terminal to terminal No. 3 and battery ground terminal to terminal No. 4, and measure the resistance between the main relay terminals.
Terminal No. | Standard |
1 and 2 | Less than 1 ? |
Installation
HVAC SYSTEM (HEATER, VENTILATOR AND A/C) > Control PanelINSTALLATIONCAUTION:• Before handling the airbag system components, refer to “CAUTION” of “General Description” in “AIRBAG SYSTEM”. General Description > CAUTION">• After installing ...
Installation
SUNROOF/T-TOP/CONVERTIBLE TOP (SUNROOF) > Glass LidINSTALLATION1. GLASS LID1. Using a new TORX® bolt, install the lid assembly - sunroof.Tightening torque:4.5 N·m (0.46 kgf-m, 3.3 ft-lb)2. Perform the open/close operation checks for the glass lid.3. Check the height of the lid assembly - ...
Driving on grades
Before going down a steep hill, slow
down and shift into lower gear (if necessary,
use 1st gear) in order to utilize the
engine braking effect and prevent overheating
of your vehicle's brakes. Do not
make sudden downshifts.
When driving uphill in hot weather, the
air conditioner may ...