DRIVE SHAFT SYSTEM > Rear Drive Shaft
INSPECTION
Check the removed parts for damage, wear, corrosion etc. Repair or replace if defective.
• DOJ (Double Offset Joint):
Check for seizure, corrosion, damage, wear and excessive play.
• BJ (Bell Joint):
Check for seizure, corrosion, damage and excessive play.
• EBJ (High-Efficiency Compact Ball Fixed Joint):
Check for seizure, corrosion, damage and excessive play.
• Shaft:
Check for excessive bending, twisting, damage and wear.
• Boot:
Check for wear, warping, breakage and scratches.
• Grease:
Check for discoloration and fluidity.
Disassembly
InstallationInstallation
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > Torque Converter AssemblyINSTALLATION1. Install the O-ring to the input shaft.NOTE:• Use new O-rings.• Apply CVTF to the O-ring.2. While holding the torque converter assembly by hand, carefully install it into the torque converter case.NOTE: ...
Sliding moonroof
Open
Close
To open:
Press and hold the rear side of the
"OPEN/CLOSE" switch. The sun shade
will also be opened together with the
moonroof. The moonroof will stop at a
position approximately 1.6 in (4 cm) away
from the fully opened position. Press and
hold the rear side of the swit ...
Removal
EXTERIOR/INTERIOR TRIM > Rear BumperREMOVAL1. CROSSTREK MODEL1. Disconnect the ground cable from battery. NOTE">2. Remove the light assembly - rear combination.CAUTION:Be careful not to damage the clips.(1) Release the bolts and clips, then pull out the light assembly - rear combination ...