COMMUNICATION SYSTEM > Relay and Fuse
INSPECTION
1. CHECK FUSE
1. Remove the fuse and check visually.
2. If the fuse is blown out, replace the fuse.
2. CHECK RELAY
1. Check the resistance between relay terminals.
Terminal No. | Inspection conditions | Specification | Circuit |
1 — 2 | Always | 1 M? or more |

1 — 2
Apply battery voltage between 4 — 3 terminals.
Less than 1 ?
2. Replace the relay if the inspection result is not within the standard value.
Relay and fuse
LocationInstallation
FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Fuel PumpINSTALLATION1. Install the fuel pump assembly to the fuel tank.(1) Make sure the sealing portion is free from fuel or foreign matter before installation.(2) Align the protrusion (A) of the gasket to the position shown in the figure, and install the g ...
Installation
LIGHTING SYSTEM > Auto Headlight Beam Leveler Control ModuleINSTALLATIONCAUTION:Before handling the airbag system components, refer to “CAUTION” of “General Description” in “AIRBAG SYSTEM”. General Description > CAUTION">Install each part in the rev ...
Dtc p0967 pressure control solenoid "b" control circuit high
CONTINUOUSLY VARIABLE TRANSMISSION (DIAGNOSTICS) > Diagnostic Procedure with Diagnostic Trouble Code (DTC)DTC P0967 PRESSURE CONTROL SOLENOID "B" CONTROL CIRCUIT HIGHDTC detecting condition:Immediately at fault recognitionTrouble symptom:Engine speed increases abruptly, and can not star ...