When the ignition switch is in the "ACC" or "ON" position, the initial screen will be displayed and the system will begin operating.


Entering letters and numbers/list screen operation
Connecting and disconnecting a USB memory/portable deviceInspection
LIGHTING SYSTEM > Back-up Light SystemINSPECTION1. CHECK BACK-UP LIGHT SWITCH (MT MODEL)Refer to “INSPECTION” of the “Switches and Harness” in “MANUAL TRANSMISSION AND DIFFERENTIAL” section. Switches and Harness > INSPECTION">2. CHECK INHIBITOR SWIT ...
Location
LIGHTING SYSTEM > Relay and FuseLOCATIONMain fuse boxHeadlight relay (HI)(A)Headlight relay (LO)(B)Fuse 15 A (daytime running light relay)(C)Fuse 30 A (combination light LH/RH)(D)Fuse 20 A (spot map light, room light, ignition switch illumination (immobilizer antenna))(E)Fuse 15 A (tail and illum ...
Electrical specification
LAN SYSTEM (DIAGNOSTICS) > Control Module I/O SignalELECTRICAL SPECIFICATION• Body integrated unitFor I/O signals of the body integrated unit, refer to BODY CONTROL SYSTEM (DIAGNOSTICS). Control Module I/O Signal">• Engine CMFor I/O signals of ECM, refer to ENGINE (DIAGNOSTIC ...