Installation
InspectionSpecifications
Dimensions
These specifications are subject to change without notice.
*: Measured with vehicle empty
Engine
Fuel
For more details, refer to "Fuel" F7-3. ...
Installation
STARTING/CHARGING SYSTEMS(H4DO) > BatteryINSTALLATIONCAUTION:After the battery is installed, initial diagnosis of the electronic throttle control is performed. Wait for 10 seconds or more after turning the ignition switch to ON, and then start the engine.1. Install the battery.2. Set the battery ...
Removal
HVAC SYSTEM (HEATER, VENTILATOR AND A/C) > Blower MotorREMOVAL1. Disconnect the ground cable from battery. NOTE">2. Release the clips, and remove the under cover assembly - passenger.3. Remove the blower - motor.(1) Disconnect the connector.(2) Remove the screws and detach the blower - m ...