Installation
InspectionInspection
MANUAL TRANSMISSION AND DIFFERENTIAL(5MT) > Main Shaft AssemblyINSPECTIONDisassembled parts should be washed with cleaning solvent first, then inspected carefully.1. BearingReplace the bearings in the following cases.• When the bearing balls, outer races and inner races are broken or rusty. ...
Caution
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > General DescriptionCAUTION• Remove contamination including dirt and corrosion before removal, installation or disassembly.• Keep the disassembled parts in order and protect them from dust and dirt.• Do not place the valve cover with it ...
Center information display (CID)
WARNING
While operating the center information display in the Subaru Ascent, always
maintain full attention to driving conditions. If interacting with the display interferes
with your concentration, safely stop the vehicle before making any adjustments.
Looking at the screen for extended peri ...