CLUTCH SYSTEM > Master Cylinder
ASSEMBLY
1. Apply a coat of grease to the contact surfaces of the push rod and piston before installation.
Grease:
SILICONE GREASE G-40M or equivalent

2. Assemble in the reverse order of disassembly.
Tightening torque:
10 N·m (1.0 kgf-m, 7.4 ft-lb)
Master cylinder
RemovalInspection
FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Knock SensorINSPECTION1. Check that the knock sensor has no deformation, cracks or other damages.2. Measure the resistance between knock sensor terminals.Terminal No.Standard1 and 2560±28 k? ...
Inspection
EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > EGR Control ValveINSPECTION1. Check that the EGR control valve has no deformation, cracks or other damages.2. Measure the resistance between EGR control valve terminals.Terminal No.Standard2 and 122±2 ?2 and 322±2 ?5 and 422±2 ?5 and 622 ...
Tire inspection
Check on a daily basis that the tires are
free from serious damage, nails, and
stones. At the same time, check the tires
for abnormal wear.
Contact your SUBARU dealer immediately
if you find any problem.
NOTE
When the wheels and tires strike
curbs or are subjected to harsh treatment
as wh ...