Subaru Crosstrek manuals

Subaru Crosstrek Service Manual: Egr cooler

Installation
EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > EGR Control ValveINSTALLATIONInstall in the reverse order of removal.NOTE:Use new O-rings and gaskets.Tightening torque:22 N·m (2.2 k ...

Inspection
EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > EGR CoolerINSPECTION1. Check that the EGR cooler has no deformation, cracks or other damages.2. Check that the hose has no cracks, damage or ...

Other materials:

Note
LIGHTING SYSTEM > Stop Light SystemNOTEFor operation procedures of each component of the stop light system, refer to the respective section.• Rear combination light assembly: Rear Combination Light Assembly">• Tail light/stop light bulb: Tail/Stop Light Bulb">• ...

Locking and unlocking
Release button Mechanical key While pressing the release button of the access key, take out the mechanical key. Lock or unlock the driver's door with the mechanical key in the procedure described in "Locking and unlocking from the outside" F2-5. NOTE After locking or unlocking, ...

Installation
HVAC SYSTEM (HEATER, VENTILATOR AND A/C) > Heater and Cooling UnitINSTALLATIONCAUTION:• Replace O-rings with new parts and install securely.• Before handling the airbag system components, refer to “CAUTION” of “General Description” in “AIRBAG SYSTEM&rdquo ...

© 2016-2021 Copyright www.sucross.com